News Release

GCC/L. Cisneros
Subscribe
![]() |
The North Rim of Grand Canyon National Park will open on Thursday, May 15 at 6 a.m. to mark the official start of the 2025 season. Grand Canyon Lodge and Grand Canyon Trail Rides will also commence their 2025 seasonal operations on this date.
Visitor services, including the campground, Grand Canyon Conservancy bookstore and the Backcountry Information Center will open at 8 a.m. Rangers will be available daily from 10 a.m.to 4 p.m. to provide information, trip planning assistance, and Park Ranger Programs at the Roaring Springs Overlook Kiosk through October 15. Grand Canyon Lodge North Rim operations, including lodging, groceries, retail, food and beverage services, shower and laundry and the gas station, will also open May 15. The lodge dining room will be open for breakfast, lunch and dinner with reservations required for dinner service. The last day of the 2025 season for most commercial services will be October 15, 2025.
The Bright Angel Point Trail on the North Rim leading to Bright Angel Point will be closed for construction for the entirety of the 2025 season. The trail will be closed to all pedestrian traffic as National Park Service (NPS) personnel replace asphalt, move large rocks, and operate equipment in these areas. This closure is necessary for the protection of staff and visiting public during an extensive repair effort to the Bright Angel Point Trail.
Overnight lodging reservations for North Rim facilities may be made by contacting Aramark Destinations at 877- 386-4383 or by visiting their website at grandcanyonnorth.com. For information on Grand Canyon Trail Rides, please call 435-679-8665 or visit their website at www.canyonrides.com.
Reservations for the North Rim Campground must be made by calling 877-444-6777 or online at https://www.recreation.gov/camping/campgrounds/232489. Campground reservations outside of the park at Demotte Campground, located on the Kaibab National Forest, can be booked online here.
The North Rim will be open for day use until November 30, 2025, or until the first major snowstorm if prior to that date.
-NPS-
Last updated: April 21, 2025